top of page

http://www.elsa-sculpteur.com/

Public·28 membres

Jonathan Morris
Jonathan Morris

Christus [Schematic]



At SH46, the existing overpass is being replaced with a new overpassconsisting of two through lanes and a left turnlane in each direction. The access roads adjacent to theoverpass are being re-aligned inwardtoward the mainlanes and portions of the old access roads at School St.and Upper Balcones Rd. are being converted to local service streetsto maintain access but configured tominimize conflicts. A westbound to eastbound turnaround is also beingconstructed. Although not shown on the schematic below, the park& ride lot is being kept in its current location but is beingreconfigured.




Christus [Schematic]


Download: https://www.google.com/url?q=https%3A%2F%2Fblltly.com%2F2udouh&sa=D&sntz=1&usg=AOvVaw1NaTFhahIemtzYungoIVUb



Ths project is constructing anew overpass for I-10 at Balcones Creek Road and theaccess roads are being converted to one-way from Balcones Creek Road toFair Oaks Parkway. Aneastbound to westbound turnaround at Fair Oaks Parkway isalso being built as part of this project (not shown in the schematic.) The access roadsbetween Balcones Creek Road and Scenic Loop Road are being converted toone-way in a separate project (see #2 above.) 041b061a72


À propos

Bienvenue dans le groupe ! Vous pouvez communiquer avec d'au...

membres

Page de groupe: Groups_SingleGroup
bottom of page